MOTC gearing up for fully electrified rail system by 2020

Focus Taiwan
Date: 2019/11/24
By: Yu Hsiao-han and Evelyn Kao

CNA file photo

Taipei, Nov. 24 (CNA) The Ministry of Transportation and Communications (MOTC) said Sunday it is gearing up to have the nationwide railway system entirely electrified by the end of next year as scheduled.

The last link of the network — the south-link railway electrification project of the Taiwan Railways Administration — is set to be completed by that time, the MOTC said in a statement.

The south-link line, which connects Pingtung and Taitung counties, is the only one that has yet to be completely electrified.

Testing and inspection of the electrification of the Pingtung section between Fangliao and Chaozhou townships, spanning 25.2 kilometers, were completed Saturday and Sunday, the MOTC said.
[FULL  STORY]

Leave a Reply

Your email address will not be published. Required fields are marked *

I accept the Privacy Policy

This site uses Akismet to reduce spam. Learn how your comment data is processed.