Taipei Times
Date: Dec 10, 2019
By: Shelley Shan / Staff reporter
The Civil Aeronautics Administration (CAA) yesterday said it is leaning toward a plan to demolish the

A taxi pickup and drop-off point at Kaohsiung International Airport is pictured on March 28.
Photo: CNA
The domestic and international terminals are currently connected by a 343m-long passageway.
With the number of international flights increasing, the CAA at the end of 2017 began proposing ways to revamp the airport’s terminals.
A proposal to tear down the two terminals and build a new one was considered after reviewing two other options, the CAA said.8 [FULL STORY]