Focus Taiwan
Date: 2015/07/16
By: C.C. Hsieh and Lillian Lin
Taipei, July 16 (CNA) The Cabinet on Thursday approved a draft of revisions to the Power Industry Law (電業法), which will require the state-run Taiwan Power Co. to separate the operations of power generation and power transmission.
According to the draft, Taipower should accomplish the separation of management of power generation from power transmission within 5 years after the revised law is enforced. [FULL STORY]