Taipei Universiade swimming pool assembly process revealed on Facebook

Assembly of the pool will take about 60 days to complete

Taiwan News
Date: 017/03/19
By: George Liao, Taiwan News, Staff Writer

A technician from the university posted an article on his Facebook, revealing how the

Photo from Wang Yung-chang’s Facebook post

movable pool is being assembled and his thoughts on the project.

A technician from the university posted an article on his Facebook, revealing how the movable pool is being assembled and his thoughts on the project.

TAIPEI (Taiwan News)–A technician from the university where the swimming pool-to-be of the 2017 Taipei Summer Universiade is being built posted an article on his Facebook, revealing how the movable pool is being assembled and his thoughts on the project.

National Taiwan Sport University technician Wang Yung-chang (王永彰) said on his Facebook page that when he first found out that a temporary standard swimming pool was going to be installed in the school’s gym for the Universiade competition and tons of water would be pumped into the gym, “the first thing that came to mind was the picture of a bunch of kids swimming in an inflatable pool in a sunlit garden; and the gym was going to host a giant inflatable swimming pool where elite swimming athletes from around the world were going to compete in water polo matches.”
[FULL  STORY]

Leave a Reply

Your email address will not be published. Required fields are marked *

I accept the Privacy Policy

This site uses Akismet to reduce spam. Learn how your comment data is processed.